| Lieu d'origine: | Chine |
| Nom de marque: | CEC TANKS |
| Certification: | ISO 9001:2008, AWWA D103 , OSHA , BSCI |
| Numéro de modèle: | W |
| Quantité de commande min: | 1SET |
| Prix: | $5000~$20000 one set |
| Détails d'emballage: | Poly-mousse PE entre chaque deux plaques d'acier ; palette en bois et bois |
| Délai de livraison: | 10-30 jours après le dépôt reçu |
| Conditions de paiement: | LC, T/T |
| Capacité d'approvisionnement: | 60 ensembles par mois |
|
Les informations détaillées |
|||
In the complex architecture of a biogas plant, the biogas preliminary tank—often referred to as a reception or buffer tank—serves as the critical first point of entry for raw organic matter. Whether the feedstock is liquid manure, food waste, or agricultural slurry, it often contains heavy inorganic solids like sand and grit, along with fluctuating concentrations of organic acids and ammonia. The primary function of this tank is to homogenize the material, facilitate initial sedimentation of heavy particles, and stabilize the flow rate before it enters the primary anaerobic reactor. Because this stage involves raw, untreated waste, the internal environment is highly aggressive and subject to significant mechanical wear from grit and heavy solids. A preliminary tank must be a high-performance vessel that provides a corrosion-free and structurally rigid environment to prevent process interruptions downstream.
To provide a resilient and economical solution for this vital pre-treatment stage, Epoxy Coated Tanks (Epoxy Coated Steel Tanks) are the preferred industry choice. These bolted steel units offer factory-certified protection specifically engineered to manage the abrasive and chemical demands of raw feedstock handling.
Our Epoxy Coated Tanks are configured to handle the heavy-duty requirements of the initial waste-to-energy stage:
Raw Feedstock Reception: Serving as the intake point for diverse organic waste streams before homogenization.
Grit and Sedimentation Units: Facilitating the settling of heavy inorganic materials to protect downstream pumps and mixers.
Hydrolysis and Acidification Buffering: Managing the initial biological breakdown where volatile fatty acid concentrations are highest.
Material Equalization: Balancing the $pH$ and temperature of incoming waste to ensure a steady feed to the primary digesters.
The primary advantage of selecting Epoxy Coated Tanks for preliminary treatment lies in their specialized material engineering:
Superior Resistance to Abrasive Solids: Raw feedstock often contains grit and sand. The factory-applied epoxy coating provides a hard, non-porous surface that resists mechanical scouring, ensuring the structure remains corrosion-free.
Chemical Barrier Against Raw Acids: The epoxy coating is chemically inert to the high concentrations of organic acids found in untreated waste, providing a permanent shield for the structural steel.
High-Tensile Modular Design: Preliminary tanks often face dynamic loads from heavy-duty mixers and variable liquid levels. Our bolted design utilizes high-tensile steel panels, precision-calculated to manage these mechanical stresses.
Total Environmental Containment: Utilizing advanced industrial sealants at every bolted joint, our tanks provide a 100% leak-proof environment, preventing the seepage of raw, untreated waste into the local ecosystem.
Preliminary tank projects require specialized configurations to handle heavy slurries and environmental factors:
To provide a total weather-tight seal and a durable cover for the raw waste headspace, we integrate Aluminum Dome Roofs as a strategic standard.
Resistance to Raw Ammonia Vapors: Aluminum is naturally immune to the corrosive gases that accumulate in the headspace of a reception tank, outperforming traditional steel or concrete covers.
Structural Support for Mixers: The geodesic design provides immense strength without internal pillars, allowing for the installation of heavy-duty top-mounted agitators required to keep solids in suspension.
Odor and Vapor Control: The precision fit of the aluminum dome ensures that odors from raw waste are contained, which is vital for facilities located near residential or commercial zones.
Our tanks are customized with reinforced discharge nozzles, grit-removal sumps, and internal heating manifold supports, ensuring the preliminary tank is perfectly integrated with the plant’s intake and pumping systems.
Our Epoxy Coated Tanks for preliminary waste handling meet the world’s most recognized benchmarks:
Global Quality Compliance: Meeting AWWA D103 and ISO standards for bolted steel containment and structural safety.
Quality Assurance: Every panel undergoes high-voltage factory testing to ensure coating thickness and zero porosity, providing a perfect barrier for the project’s lifespan.
Risk Assessment: Precision-calculated for dynamic material loads, seismic requirements, and extreme wind loads to ensure operational safety in industrial environments.
The prefabricated nature of Epoxy Coated Tanks allows for rapid on-site assembly. This is vital for facilities that need to expand their intake capacity without long shutdowns. Using a "top-down" jacking system, the tank is constructed at ground level, which significantly reduces the need for heavy cranes and improves overall site safety.
The durable epoxy finish is designed for long-term service with minimal intervention. This results in an economical lifecycle where maintenance is limited to routine inspections of seals and fittings, ensuring that the facility's waste intake and energy production remains constant.
The reliability of our technology in managing heavy biological loads is demonstrated in these non-fictitious projects:
Sichuan Chengdu Wastewater Treatment Plant Project: This project utilized 16 units of tanks to manage massive material volumes, proving the structural stability and modular efficiency required for large-scale anaerobic systems.
Saudi Municipal Sewage and Industrial Waste Project: In a region of extreme heat and environmental stress, 5 units of these tanks were installed to provide a durable, corrosion-free solution for waste management.
Hebei Municipal Water and Sewage Infrastructure Project: This project utilized 1 unit of a high-integrity bolted tank to support critical regional utility service, showcasing the reliability of the bolted system.
Our company’s core competitiveness lies in our ability to deliver "Process-Ready Intake Solutions." We combine the structural resilience of Epoxy Coated Tanks with the advanced shielding of Aluminum Dome Roofs. By providing a comprehensive package—from feedstock-load modeling and risk assessment to final installation—we ensure that your biogas preliminary tank is equipped with a system built to maximize process stability and ensure decades of reliable, safe operation.